High-speed line to Kapıkule opens: rail journey from Istanbul to the border drops from 4.5 to 1.5 hours
On 9 October 2026 the Çerkezköy–Kapıkule section of the high-speed line from Istanbul to the Bulgarian border was opened in Babaeski, Kırklareli Province. Journey times for passengers fall from 4.5 to 1.5 hours, annual capacity rises from 600,000 to 3 million passengers and, in freight, from 1.5 to 9.5 million tonnes. Kapıkule station grows from 23 to 42 tracks and its track length from 15,675 to 51,000 metres. Construction began in 2019 and is jointly financed by Türkiye and the EU; the report gives no timetable for the Bulgarian side of the link.




